2014

Bathroom Renovation #2

Complete bathroom renovation carried out in older French Property.

We ripped out the entire existing bathroom units including tiles. The whole bathroom was then retiles and new fixtures and fittings were installed. The client requested a douche italienne and so the floor was elevated with a concrete base to accommodate the new plumbing work and then the tiling was completed afterwards. Aqua Placo / aqua blue plaster boarding was used on the new walls as the bathroom was re-configurated and a waterproof coating was added to the shower area.

Maison Bretagne carried out the project management, Floor work, plaster boarding and tiling work. All plumbing work was carried out by one of our partnered professionals, fully registered and insured in France.

Bathroom tiles sourced at: Aubade https://www.espace-aubade.fr

Fixtures and fittings sourced by the client online at: http://www.devon-devon.com/fr/

 